A peek at interior work at the College
Thanks to the grant funding received this past summer, the roof near the bell tower has been repaired and it no longer leaks during rainstorms.
That has allowed the board to focus on other projects that are on the “To Do” list, including the plaster repair work in the first-floor entry way and both stairwells leading to the balcony.
Scott Baldwin has been busy replacing woodwork, such as trim, window sills and window boxes, as well as transoms, including the one above the door leading into the balcony.
Doors also have been replaced to the stairwells from the entry way.